Rain2Go

image
image

Wordcloud

image

Mindmap

Characters / Users

Who is going to use our design/technology? Make a drawing of your character/user.

image

Insight Statemen

Write a simple problem definition statement.

πŸ’‘
Children needs a way to carry clean water because the water collection points are spread out and the water is heavy.
πŸ’‘
Women need to find a quick way to gather and store water because they have many errands to do

Sketches

Stage 1: How to collect and filter

image

Proposal 1: Using the existing structural systems and also the topography to collect water for refugees in each level.

image

Proposal 2: Using Collapsible β€œupside-down" tent to collect water on ramps

image
image
image

Thinking Process of Proposal 1

image

-

image
image
image
image

Thinking process of Proposal 2

Stage 2: How to transport the water.

image
image
image
image

image
image
image

Deliverable 8. Choose a (temporary) team name, and choose one simple visual for your team

Assignment for Oct 9

Add comments from our guests and feedback from your peers

It is better to consider a distributed system rather than centralized water collection system

Each section of the refugee camp is managed by a different WASH group

Source: Mike Zuckerman, 2020/09/25 Session at HKU from Ugan

Further research

WASH takes care of the water system in Cox's Bazar, so it would be good to see what they're already trying to do

Keep developing designs - 3 detailed sketches of your design and technology

Choose a design to prototype

At some point, you have to take a leap of faith :) Choose one design and prototype it. Document the making of it.

Rapid Prototyping

Add photos of your process, your making of

prototype 2.pdf1429.1KB

Video Prototype role-playing (1 minute)

Post your 1 minute video on youtube as unlisted and post it here

Project Manage

Prototype 2

Prototype 3

To help you manage your project, I suggest using a simple project management system like a Kanban/Trello board. Don't forget to

  • Be specific with the task. Link to the source
  • Assign one person per task. Of course, you can collaborate, but one person is responsible for the completion of one task
  • Deadline. So that your team can coordinate and nothing falls between the cracks.

Copy of Tasks

Not started
Draw detail drawing of the prototypes
October 2, 2020
In progress
Task 2
Completed

Prototype 2